Eddie Sigrist | Consultant

B. Eng. Industrial Engineer

Successful and sustainable production requires efficient and optimised factories. At GREAN, we understand this and for this reason we develop customised solutions that are precisely tailored to the individual needs and requirements of our customers.

Eddie Sigrist studied industrial engineering on a practice-integrated basis at the FH Bielefeld. The focus of the theoretical part of his studies was on production, technology and project management. Due to this combination, he is able to plan and accompany projects effectively and to implement them successfully from an economic point of view.

During the practical part of his studies, he worked in the engineering department at Wellmann Anlagentechnik GmbH. Here he supported and managed projects in plant construction for the food industry. The core topics were the planning and implementation as well as optimisation of plants for production processes.

Eddie Sigrist has been part of GREAN GmbH since 2023. His work focuses on the areas of production design and factory planning.

GREAN GmbH



Factory planning

New construction on a greenfield site or expansion of existing buildings - we offer you comprehensive advice and sophisticated planning services for a well conceived factory. For us, this includes basic master and factory structure planning as well as support for your project right through to implementation. Whether new or reorganisation planning - we are experts in factory planning.

Process optimization

In many factories, high inventories, long travel, search or lead times are a major cost factor, which at the same time massively reduces production efficiency. This is what we do: Our customers benefit from well-founded, systematic and analytical consulting. In this way, we work with you to increase the efficiency of your production.

Resource efficiency

High and ever increasing material and energy costs are becoming an efficiency problem in many factories. We systematically investigate where potential is lying dormant and then identify meaningful and economical measures for improvement. In this way we increase the material and energy efficiency in your factory - and at the same time reduce your energy bill.

© 2021 GREAN GmbH. All rights reserved.