Skip to main content

Tobias Heinen | CEO

Dr.-Ing. | Dipl.-Wirtsch.-Ing.

What distinguishes us at GREAN is that we are absolute method champions. No problem is too tricky for us. We familiarize ourselves systematically and analytically and surprise with creative solutions “out of the box”.

Dr. Tobias Heinen studied industrial engineering with a focus on production technology at the universities of Hanover, Halle/Saale and Port Elizabeth (South Africa). He then worked as a research assistant at the Institute for Factory Systems and Logistics at Leibniz University of Hanover and received his doctorate (Dr.-Ing.) in 2011. He is a lecturer at Leibniz University of Hanover on the subject of “Sustainability in production”.

Special expertise in the fields of factory planning and implementation as well as production logistics. He also focuses on strategic energy management and energy efficiency. Project experience inter alia for Forbo Siegling, the Harting Technology Group, the Hettich Group or Stüken. International project experience i.a. for the Sartorius Group in the UK, France and Finland.

GREAN GmbH



Factory planning

New construction on a greenfield site or expansion of existing buildings - we offer you comprehensive advice and sophisticated planning services for a well conceived factory. For us, this includes basic master and factory structure planning as well as support for your project right through to implementation. Whether new or reorganisation planning - we are experts in factory planning.

Process optimization

In many factories, high inventories, long travel, search or lead times are a major cost factor, which at the same time massively reduces production efficiency. This is what we do: Our customers benefit from well-founded, systematic and analytical consulting. In this way, we work with you to increase the efficiency of your production.

Resource efficiency

High and ever increasing material and energy costs are becoming an efficiency problem in many factories. We systematically investigate where potential is lying dormant and then identify meaningful and economical measures for improvement. In this way we increase the material and energy efficiency in your factory - and at the same time reduce your energy bill.

© 2021 GREAN GmbH. All rights reserved.