Skip to main content

Reorganisation of the production supply and disposal

Pharmaceutical industry

Client
Sartorius Stedim Biotech GmbH

Time period
11/2012 to 03/2013

Planning object
Design of a concept for a goods receipt and dispatch with adapted layout

Image source
bünemann & collegen

As part of a cross-site master plan, Sartorius Stedim Biotech GmbH decided in 2012 to shift all logistics traffic from the inner zones to the peripheral areas of the plant. The direct connection via the surrounding roads was to optimize logistical processes and at the same time create a campus free of cars and trucks. To achieve this goal, an incoming and outgoing goods department for the supply and disposal of a production building had to be relocated to a new building.

Together with the Institute for Factory Systems and Logistics, GREAN supported the client in reorganising the incoming and outgoing goods department. Within the scope of the project, a rough concept for the design of the future incoming and outgoing goods department was developed in several workshops together with the customer. In addition, a layout for the transfer of the freed-up space into a central final packaging was designed within the project.

In detail, the following services were provided:

  • Recording the ACTUAL situation

  • Recording existing material flows

  • Identification of potentials and fields of action

  • Derivation of a concept for the restructuring of incoming and outgoing goods

  • Development of a coarse layout for incoming and outgoing goods and the central final packaging

GREAN GmbH



Factory planning

New construction on a greenfield site or expansion of existing buildings - we offer you comprehensive advice and sophisticated planning services for a well conceived factory. For us, this includes basic master and factory structure planning as well as support for your project right through to implementation. Whether new or reorganisation planning - we are experts in factory planning.

Process optimization

In many factories, high inventories, long travel, search or lead times are a major cost factor, which at the same time massively reduces production efficiency. This is what we do: Our customers benefit from well-founded, systematic and analytical consulting. In this way, we work with you to increase the efficiency of your production.

Resource efficiency

High and ever increasing material and energy costs are becoming an efficiency problem in many factories. We systematically investigate where potential is lying dormant and then identify meaningful and economical measures for improvement. In this way we increase the material and energy efficiency in your factory - and at the same time reduce your energy bill.

© 2024 GREAN GmbH. All rights reserved.